In January 2012, survey work for WPs 6&7 has resumed in Nakhon Pathom and Chachoengsao among tilapia farmers. These areas were affected by the flooding in Thailand last year so the survey schedule was moved to January. The livelihood survey will be conducted if the farms have also been selected for WP5.
Remaining field work which needs to be done include the following:- WP3 – Life Cycle Assessment of hatcheries, farms, processing plants, feedmills
- WP4 – Water, sediment and feed sample collection from farms
- WP5 – Livelihood survey of farms
- WP6 – FZT and probiotics (in tilapia)
- WP8 – Stakeholder workshops